Project Overview
Pacific Highway and the LOSSAN Corridor are two critical transportation arteries in the Old Town to Downtown San Diego corridor. This project will carefully consider existing planned projects and enhancements in this area while also exploring new solutions. The Old Town to Downtown Rail and Multimodal Corridor Study (OT2DT) consists of two related projects:
- Pacific Highway Multimodal Access Corridor (PacMAC): This project will develop and assess various transportation solutions along Pacific Highway between Sea World Drive and Grape Street in the City of San Diego. Solutions such as transit priority and traffic safety improvements can enhance mobility and restore local travel connections between San Diego’s oldest communities.
- San Diego At-Grade Crossings Elimination Study (SD-ACES): Between Taylor Street in Old Town San Diego and West Ash Street in Downtown San Diego, there are 11 at-grade rail crossings where vehicle traffic and trains traveling the LOSSAN Corridor must share space. This project will analyze opportunities to separate rail and vehicle traffic at crossings and explore potential configurations.
Together, these two projects seek to increase safety in the area and improve the connection between Old Town and Downtown San Diego. These are the primary goals of the study:
- Provide safe and accessible routes for people who walk, ride bikes, take transit, and drive by removing or mitigating common points of conflict.
- Increase transportation network capacity to accommodate additional rail transit frequency.
- Integrate both the road and rail systems into a cohesive and efficient multimodal community connection.
Schedule
As of 2026, this project is in the early stages of planning. We are analyzing existing conditions, soliciting public and partner feedback, and developing alternatives. We expect to complete near-term and longer-term conceptual engineering work in summer 2028, at which point the project will advance into environmental clearance.
Budget
The PacMAC project has $2,529,825 of Federal Highway Administration Surface Transportation Block Grant Program funding. The SD-ACES project has $1,871,000 in combined funding from the Federal Transit Administration’s Urbanized Area Formula Funding program, the Federal Railroad Administration’s Consolidated Rail Infrastructure and Safety Improvements Program, and TransNet Major Corridors.
Connect with Us
Subscribe to receive email updates with information about this project and opportunities to provide feedback that helps shape SANDAG’s work. For more information, contact pio@sandag.org.