As part of the TransNet program, a Bus Rapid Transit (BRT) service is being planned in the I-805 corridor connecting South Bay with Kearny Mesa, UTC, UCSD, and Sorrento Mesa. View map.
The planned BRT services will run on dedicated lanes along I-805, providing fast, high frequency regional bus service on high-quality vehicles. This project will study the connection between the I-805 service and the 47th Street Trolley Station in order to improve the connectivity of the regional transit system providing vital connections for the Southeastern San Diego community to major employment areas throughout the region.
Through a collaborative effort with the Southeast San Diego Community, station design options will be developed and evaluated.
This project also will study the improvement of pedestrian/bicycle access and safety, making transit a more viable option for residents, improving access to regional employment centers and retail services, and supporting existing community revitalization efforts.
Project alternatives will incorporate the analysis of potential impacts and benefits of the project on public health via the Health Impact Assessment (HIA) currently being conducted by SANDAG as part of the Healthy Works grant program.
Community Working Group Discussions
The Project Development Team has been meeting with the 47th Street Trolley Station Area Planning Working Group to identify objectives and criteria to evaluate alternatives.
Goals and Objectives
Alternatives Discussed
Levels and Connections Summary of Alternatives Evaluated
Freeway Level Alternatives 1A - Freeway Level, In-Line Station, Side Platforms 1B - Freeway Level, In-Line Station, Center Platform
Mid-Level Alternatives 2A – Mid-Level, In-Line Station, Side Platforms 2B – Mid-Level, Off-Line Station Flyover, West Side Platform Tunnel Crossing Under Tracks 2C – Mid-Level, Off-Line Station Flyover, East Side Platform Tunnel Crossing Under Tracks 2D – Mid-Level, Off-Line Station Flyover, West Side Platform Open Crossing Under Tracks 2E – Mid-Level, Off-Line Station Flyover, East Side Platform Open Crossing Under Tracks
Track Level Alternatives 3A – Track Level, In-Line Station, Left Hand DAR 3B – Track Level, Off-Line Station, Left Hand DAR, West Side Platform 3C – Track Level, Off-Line Station, Left Hand DAR, East Side Platform 3D – Track Level, In-Line Station, Right Hand DAR 3E – Track Level, Off-Line Station, Right Hand DAR, West Side Platform 3F – Track Level, Off-Line Station, Right Hand DAR, East Side Platform 3G – Track Level, Off-Line Station, Flyover, West Side Platform 3H – Track Level, Off-Line Station, Flyover, East Side Platform
Evaluation Criteria* *These scores and rankings were used to guide discussions about which alternatives should continue to be evaluated.
Alternatives Recommended for Detailed Analysis 1. Freeway Level, In-Line Station, Side Platforms (Formerly 1A) 2. Mid-Level, In-Line Station, Side Platforms (Formerly 2A) 3. Track Level, In-Line Station, Left Hand DAR (Formerly 3A) 4. Track Level, Off-Line Station, Left Hand DAR (Formerly 3C) 4A. Track Level, Off-Line Station, Left Hand DAR, East Side Platform 4B. Track Level, Off-Line Station, Left Hand DAR, Bus Access to Existing Parking Lot 5. Track Level, Off-line Station, Flyover East Side Platform (Formerly 3H)
The following alternatives were eliminated during the April 29 Community Working Group Meeting:
2C: Mid-Level Off-Line Station, Flyover, East Side Platform Tunnel Crossing Under Tracks 3B: Track Level, Off-Line Station, Side Platforms, West Side Platform
47th Street Trolley Station Area Planning Community Working Group
Next Meeting
Monday, June 10, 2013 6:30 p.m. – 8:30 p.m. Joe & Vi Jacobs Center Breakout Room F* 404 Euclid Avenue, San Diego, CA 92114 Flier * Please note new meeting location. See above flier for details.
Past Meetings
Monday, April 29, 2013 Flier Meeting Summary: English | En Español Detailed Scoping Matrix Presentation NPDES Project Map
Site Tour Saturday, December 1, 2012 Flier Meeting Summary: English | En Español
Monday, September 24, 2012 Flier Presentation Meeting Summary: English | En Español
Monday, June 4, 2012 Flier Presentation Meeting Summary: English | En Español
Monday, March 5, 2012 Flier Presentation View Meeting Summary
Traducción al español disponible a solicitud. |